Integrated urban development concept (ISEK)
Measures
The integrated urban development concept is currently being revised. Once it has been finalised, you will find the latest information and projects here.
Redesign of Gasthausplatz
The Gasthausplatz is to be remodelled. To improve the quality of the area, only delivery traffic will drive around the Gasthausplatz in future. The Gasthausplatz will no longer be used as a car park. The weekly market will also be relocated, creating new opportunities for entertainment. The concept envisages the creation of green catering containers in the south-west and north-east of the square. In addition, a kind of beer garden will be built there under new trees, which will not be assigned to any catering outlets. The restaurant can also dispose of further outdoor catering areas. Additional seating and a water feature are also planned
Old Sparkasse / St.-Georg-Platz site
The city of Bocholt and Stadtsparkasse Bocholt are planning a joint development of Manes-Schlatt-Platz and the properties at Markt 8 and Neustraße 2-4, where retail, catering and service spaces are to be created alongside the city museum and the city archive. The upper floors will house flats.
The public space is also to be remodelled in the course of the building work. The small car park to the south of St George's Church is to become a green area with recreational facilities. The traffic area is also to be adapted.
Station surroundings
As part of the state initiative "Bauland an der Schiene", a framework plan for the area around the railway station in Bocholt is to be drawn up in 2020. Among other things, this provides for the redesign of the station square. Furthermore, the city of Bocholt's Integrated Mobility Concept 2035 includes measures around Bocholt railway station. Various plans have been initiated on the basis of these plans and concepts. On the one hand, engineering planning has been commissioned for the remodelling of Bocholt railway station. The intersection of Theodor-Heuss-Ring/Ebertstraße/Kreuzstraße/Hindenburgstraße/Industriestraße has also been considered. A feasibility study was carried out for a multi-storey car park on Ewaldstraße.
The aim of the measure is to make public transport more attractive and to better link different modes of transport. It is therefore planned to develop the railway station into a mobile station. Additional bus stop capacities are to be created in order to expand the municipal and regional bus services. Improved parking facilities for bicycles are also to be created. Compressing the traffic areas will also create more recreational areas. In addition, the neighbouring junction is to be modified with the aim of improving road safety for pedestrians and cyclists in particular.
Aa south bank
The bank area will be widened so that more space can be created for play and seating. The playground will have play facilities for different age groups. Various seating areas will also be created. In addition to improving the quality of the area, it will also be ecologically enhanced. Insect-friendly perennials will be planted for this purpose. The existing trees will be preserved as far as possible. New trees will also be planted.
From Neutorplatz to the sunken bridge, there will be a water-bound footpath and an asphalted cycle path