28. February 2023Traffic
Impairments possible at Bömkesweg/Loikumer Weg
From 28 February 2023
Due to necessary sewer rehabilitation measures, there may be traffic disruptions on Bömkesweg / Loikumer Weg and Bömkesweg / Dingdener Str. from 28.02.23 onwards.
It will not be possible to turn into Loikumer Weg from Bömkesweg, nor will it be possible to pass through Loikumer Weg via the crossing area into the further course.
Pedestrian and bicycle traffic can continue to cross the area.