18. September 2025Traffic
Westring tunnel: Closure due to maintenance work
Full closure for several hours in both directions // 25 to 26 September 2025 // 4 p.m. to 2 a.m.
Due to regular maintenance work on the technical tunnel equipment, the tunnel of the western bypass must be closed on 25 September from 4 p.m. until probably 2 a.m. on 26 September.
Road users will be informed of the closure and diverted accordingly using the traffic lights and existing signage at the entrances to Schwanenstraße and Dinxperloer Straße. Drivers are asked to avoid the area if possible.

