
© Stadt Bocholt
Due to construction work, the area around the level crossing on Bömkesweg will be closed from 11 to 14 November 202603. November 2026Traffic
Construction work: Complete closure at the Böhmkesweg level crossing
Complete closure from 11 to 14 November 2026 // Works in the vicinity of the level crossing // Diversion signposted
Due to essential construction work, the area around the level crossing on Bömkesweg will be closed from 11 to 14 November 2026. Pedestrians and cyclists will still be able to pass through the area.
A diversion route has been put in place for motor vehicles, running via Dingdener Straße, Schaffeldstraße and Loikumer Weg.
